ExpiredContract NoticeWorks🇪🇺 EU FundedTED 93/2026

Construction of Nikšić Wastewater Management System – Sewerage Network Phase II

Contracting Authority

Publication (OJ)

May 13, 2026

Submission Deadline

Jun 2, 2026

Contract Duration

36.0 months

Procedure Type

Open procedure

Buyer headquarters

Nikšić (81400)

Description

Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corrugated PE pipes is the collector’s material and concrete is the manhole material. - Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of Ø200 mm with a length of 165 m. The wastewater will be pumped through the pressure line to the existing pumping station "Duklo". - Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one.

CPV Codes

45231300

Lots (1)

LOT-0001Construction of Nikšić Wastewater Management System – Sewerage Network Phase II

Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manholes: • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corrugated PE pipes is the collector’s material and concrete is the manhole material. - Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of Ø200 mm with a length of 165 m. The wastewater will be pumped through the pressure line to the existing pumping station "Duklo". - Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one.

4523130036 months